Cherry Housing
Project Name Cherry Housing Solar Capacity 67.2kWp AC Coupled Hybrid System with BESS 245.76kWh Inverter SMA, PV Inverter, Three Phase
Project Name Cherry Housing Solar Capacity 67.2kWp AC Coupled Hybrid System with BESS 245.76kWh Inverter SMA, PV Inverter, Three Phase
Project Name Myanmar Motor Corporation Solar Capacity 103 kWp Hybrid Solar Power System with Battery Backup 122.88kWh Inverter “Deye,Three-phase HV
Project Name Star Sandar Garment Factory Solar Capacity 313. kWp On Grid Solar Power System Inverter SMA, PV Inverter, Sunny
Project Name Green Land Rice Mill Project Solar Capacity 487kWp On Grid Solar Power System Inverter SMA, PV Inverter, Sunny
State/Region Ayeyarwady Township Hinthada Village Name Lat Pan Su + KoKoSu Finished Date 9.7.2022 Project Period (Year) 14 “Connected House
State/Region Magway Township Sing Paung Wae Village Name Nyan Taw Inn Finished Date 26.6.2023 Project Period (Year) – “Affected area”
State/Region Ayeyarwady Township Latputta Village Name Shwe Pyi Thar Finished Date 9.7.2022 Project Period (Year) 14 “Connected House Hold (In
State/Region Ayeyarwady Township Hinthada Village Name Oak Shit Kone Finished Date 9.7.2022 Project Period (Year) 14 “Connected House Hold (In
State/Region Ayeyarwady Township Hinthada Village Name Chin Boet Finished Date 27.4.2022 Project Period (Year) 14 “Connected House Hold (In Contract)”